Either the AIS destination could not be matched to a port, the port is not assigned to an MoU, or the destination MoU does not publish a risk calculation scheme. The message in the MoU PSC inspection window column tells you which of these applies.
The detention risk is calculated for DNV-classed vessels only. For other vessels, the column remains empty.
The ship risk profile and inspection window published by the MoU always take precedence. The PSC Planner recalculates them from inspection data that is updated weekly, and inspections reported to more than one MoU can be counted differently, so small differences may occur.
AIS positions, destinations and ETAs are updated daily. Inspection data, and therefore the MoU ship risk and port activity, is updated weekly.
Check that the vessel is included in Selected vessels, that your email address is listed, and that all sending conditions apply: the destination meets your trigger, the inspection window is open, the ETA is less than two weeks away, no notification was already sent for this destination, and no notification was sent for this vessel in the last 5 days. A notification for a port call more than two weeks ahead is sent later, once the ETA is within two weeks.
For PSC checklist notifications, this can happen when the vessel's AIS destination changes and later changes back, with at least 5 days between the notifications. For high detention risk notifications, an alert is sent each time the destination changes to a different port, so a change from port A to port B and back to port A results in an alert for each change. See the PSC notifications page for details.
After a PSC checklist notification has been sent for a vessel, no further checklist notification is sent for that vessel for the next 5 days, regardless of your trigger setting (Next port included). This prevents too many emails when a vessel calls several ports in a short time. The next notification is sent once the 5 days have passed and the vessel's destination differs from the last notified port, provided all other conditions apply. High detention risk notifications are not affected by this limit.
Yes. The two notification types work independently of each other. Receiving one does not prevent or delay the other, and the 5-day limit applies only to PSC checklist notifications.
Watch the Tutorial video or read the Access guide, both linked at the top of the PSC Planner page. For further questions, contact the DNV port state control service using the link in the page header.